Brigade CFDBB Przewodnik Instalacji Strona 24

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 32
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 23
24
3”3”3”
10a
Place unit within 3” of being flush with cabinets.
Note: To avoid
cabinet damage, place cardboard between cabinets and unit. When
moving unit, DO NOT crimp, kink or crush water supply line.
10b
11
Carefully move unit until semi flush with cabinet
(depending on unit).
Pull supply tubing forward under unit.
Note: DO NOT use plastic water lines.
12
13
Flush water line by running two quarts of water
into a bucket. Turn water off
Connect supply tube to water valve using
a 1/2” (1.3 cm)wrench.
Note: DO NOT overtighten.
Turn on water supply and check for leaks.
14
Installation (cont.)
Przeglądanie stron 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 30 31 32

Komentarze do niniejszej Instrukcji

Brak uwag